Fusion Plating
ERP built from the shop floor up for electroless nickel, chrome, anodize and chemical conversion plating.
View Module PageSales
Configurator
Shop Floor
Receiving
Operations
Quality
KPIs
Compliance
Nuclear
Controlled Goods
Configuration
- Setting Up Facilities (5 minutes)
- Work Centres + MRP Mapping (6 minutes)
- Creating Tanks (5 minutes)
- Bath Parameters + Specs (5 minutes)
- Email Notification Templates (5 minutes)
- Invoice Strategies (5 minutes)
- Account Hold Configuration (4 minutes)
- Calibration Records (5 minutes)
- Operator Certifications (5 minutes)